 "attribution": {
  "license": "CC BY 4.0",
  "license_url": "https://creativecommons.org/licenses/by/4.0/",
  "cite_as": "Eurodatum (https://eurodatum.com/grid-access/), data: grid operators, regulators and press (source per row), checked 2026-11-20",
  "required": "Credit 'Eurodatum' with a link to the page_url when quoting numbers, charts or definitions.",
  "page_url": "https://eurodatum.com/grid-access/",
  "publisher": "Eurodatum by Cynsta.ai",
  "publisher_url": "https://cynsta.ai",
  "home": "https://eurodatum.com/"
 },
 "method": "Figures as published by grid operators/regulators or press citing them; not normalised. queue_gw stage varies (see stage). x_avg_load = queue_gw / (annual demand / 8760 h).",
 "countries": [
  {
   "country": "poland",
   "operator": "PSE",
   "as_of": "2026-04",
   "queue_gw": 130,
   "dc_gw": 130,
   "stage": "requests",
   "queue_what": "Data centre connection requests, as reported from PSE (PSE does not publish a data centre split itself)",
   "status": "reform",
   "status_note": "PSE's draft network plan assumes only about 3 GW of data centre connection capacity by 2036. The Grid Act (April 2026) adds collateral and milestone deadlines, so inactive projects lose their rights.",
   "facts": [
    "The gap between requests and PSE's own planning figure is the widest in Europe."
   ],
   "source": "https://www.gramwzielone.pl/?p=20373693",
   "source_type": "secondary",
   "more": [
    {
     "label": "PSE network plan (WBJ)",
     "url": "https://wbj.pl/pses-network-development-plan-important-reference-about-data-center-growth-potential-in-poland/post/148794",
     "type": "secondary"
    }
   ],
   "checked": "2026-11-20",
   "avg_load_gw": 19.9,
   "chart_gw": 130,
   "x_avg_load": 6.5,
   "name": "Poland"
  },
  {
   "country": "united-kingdom",
   "operator": "NESO / Ofgem (Great Britain)",
   "as_of": "2026-03",
   "queue_gw": 125,
   "dc_gw": 73,
   "stage": "contracted queue",
   "queue_what": "Contracted demand in the GB connection queue; about 73 GW (315 projects) are data centres",
   "status": "reform",
   "status_note": "Ofgem proposed a data centre commitment fee of £237,500 to £712,500 per MW (July 2026) to clear non-viable projects. GB peak demand was 45 GW in February 2026.",
   "facts": [
    "The demand queue grew from 41 GW to 125 GW in about seven months of 2025."
   ],
   "source": "https://www.ofgem.gov.uk/sites/default/files/2026-09/transforming-connections-data.pdf",
   "source_type": "primary",
   "more": [],
   "checked": "2026-11-20",
   "avg_load_gw": 36.7,
   "chart_gw": 73,
   "x_avg_load": 2.0,
   "name": "United Kingdom"
  },
  {
   "country": "italy",
   "operator": "Terna",
   "as_of": "2026-08",
   "queue_gw": 101.4,
   "dc_gw": 101.4,
   "stage": "requests",
   "queue_what": "Data centre connection requests on Terna's Econnextion portal (553 requests), as reported in the press. Terna's own last published figure: over 50 GW from 300+ projects (June 2025)",
   "status": "reform",
   "status_note": "Terna screens requests through its 'efficient territorial planning' model. Requests grew from about 30 GW at end 2024. Most are in Lombardy.",
   "facts": [],
   "source": "https://www.pmi.it/?p=499951",
   "source_type": "secondary",
   "more": [
    {
     "label": "Terna, June 2025",
     "url": "https://lightbox.terna.it/it/insight/data-center-rete-trasmissione",
     "type": "primary"
    }
   ],
   "checked": "2026-11-20",
   "avg_load_gw": 35.6,
   "chart_gw": 101.4,
   "x_avg_load": 2.9,
   "name": "Italy"
  },
  {
   "country": "denmark",
   "operator": "Energinet",
   "as_of": "2026-03",
   "queue_gw": 60,
   "dc_gw": null,
   "stage": "waiting",
   "queue_what": "New consumption projects waiting to connect across the transmission and distribution grids, driven by data centres, power-to-X and batteries",
   "status": "reform",
   "status_note": "Energinet paused new connection agreements from early March to 3 June 2026 and replaced first come, first served with batch assessment ('first ready, first served'). No new agreements before autumn 2026; very large connections may take 5 to 10 years. Peak demand is about 7 GW.",
   "facts": [],
   "source": "https://en.energinet.dk/about-our-news/news/2026/temporary-pause/",
   "source_type": "primary",
   "more": [
    {
     "label": "Energinet, new model (May 2026)",
     "url": "https://www.energinet.dk/om-nyheder/nyheder/2026/05/27/energinet-indforer-ny-model-for-storre-tilslutninger-og-vil-forst-underskrive-nye-nettilslutningsaftaler-til-efteraret/",
     "type": "primary"
    }
   ],
   "checked": "2026-11-20",
   "avg_load_gw": 4.6,
   "chart_gw": 60,
   "x_avg_load": 12.9,
   "name": "Denmark"
  },
  {
   "country": "norway",
   "operator": "Statnett",
   "as_of": "2026-11",
   "queue_gw": 27.1,
   "dc_gw": 27.1,
   "stage": "queue + requests",
   "queue_what": "Data centres: 9.1 GW in the capacity queue plus 18 GW of further requests (4.2 GW reserved, 0.8 GW connected)",
   "status": "paused",
   "status_note": "New data centre capacity reservations paused from 9 November 2026, expected to lift by 1 August 2027 at the latest, while Statnett sets technical requirements for approval by the regulator RME. Peak consumption is just over 25 GW.",
   "facts": [
    "Existing connections and facilities with approved requirements are not affected."
   ],
   "source": "https://www.statnett.no/om-statnett/nyheter-og-pressemeldinger/nyhetsarkiv-2026/midlertidige-tiltak-for-fortsatt-forsvarlig-systemdrift/",
   "source_type": "primary",
   "more": [],
   "checked": "2026-11-20",
   "avg_load_gw": 15.7,
   "chart_gw": 27.1,
   "x_avg_load": 1.7,
   "name": "Norway"
  },
  {
   "country": "france",
   "operator": "RTE",
   "as_of": "2026-05",
   "queue_gw": 18,
   "dc_gw": 18,
   "stage": "reserved",
   "queue_what": "Grid capacity reserved by RTE for about 80 data centre projects (up from about 5 GW for 40 projects at end 2024)",
   "status": "fast-track",
   "status_note": "RTE is fast-tracking five very large data centre projects (700 to 2,000 MW) and will switch to 'first ready, first served' by the end of 2026. Data centres took 3.8 GW of new grid contracts in the first half of 2026.",
   "facts": [],
   "source": "https://www.rte-france.com/bases-electricite/consommation-electricite/essor-data-centers-france",
   "source_type": "primary",
   "more": [
    {
     "label": "RTE, H1 2026 review",
     "url": "https://assets.rte-france.com/prod/public/2026-07/2026-07-16-bilan-semestre1.pdf",
     "type": "primary"
    }
   ],
   "checked": "2026-11-20",
   "avg_load_gw": 54.4,
   "chart_gw": 18,
   "x_avg_load": 0.3,
   "name": "France"
  },
  {
   "country": "netherlands",
   "operator": "Regional grid operators (Netbeheer Nederland)",
   "as_of": "2026-06",
   "queue_gw": 10.0,
   "dc_gw": null,
   "stage": "waiting list",
   "queue_what": "Capacity requested by 15,498 applicants on regional waiting lists for consumption (all sectors), plus 205 requests at TenneT",
   "status": "reform",
   "status_note": "Grid congestion covers most of the country. New allocation rules apply from 1 July 2026, and operators are tendering flexible capacity to connect part of the queue sooner.",
   "facts": [
    "Up from 9.3 GW at the end of 2025."
   ],
   "source": "https://www.netbeheernederland.nl/artikelen/nieuws/slimmer-netgebruik-wint-terrein-maar-vraag-naar-transportcapaciteit-groeit-nog",
   "source_type": "primary",
   "more": [],
   "checked": "2026-11-20",
   "avg_load_gw": 13.8,
   "chart_gw": 10.0,
   "x_avg_load": 0.7,
   "name": "Netherlands"
  },
  {
   "country": "spain",
   "operator": "Red Eléctrica (REE)",
   "as_of": "2026-09",
   "queue_gw": 6.3,
   "dc_gw": 6.3,
   "stage": "granted",
   "queue_what": "Transmission access already granted to data centres (34% of all granted demand access); none in service yet",
   "status": "auction",
   "status_note": "Spain allocates demand access at congested nodes by auction: the first round (February 2026) awarded 928 MW at eight nodes. REE says firm demand capacity is available at more than 35% of nodes.",
   "facts": [
    "REE publishes a node-by-node demand capacity map."
   ],
   "source": "https://www.ree.es/en/press-office/news/press-release/2026/09/red-electrica-publishes-the-demand-access-capacity-map-by-consumption-type",
   "source_type": "primary",
   "more": [
    {
     "label": "MITECO auction",
     "url": "https://www.miteco.gob.es/es/prensa/ultimas-noticias/2026/febrero/el-miteco-adjudica-928-mw-de-acceso-la-red-electrica-a-grandes-p.html",
     "type": "primary"
    }
   ],
   "checked": "2026-11-20",
   "avg_load_gw": 31.4,
   "chart_gw": 6.3,
   "x_avg_load": 0.2,
   "name": "Spain"
  },
  {
   "country": "sweden",
   "operator": "Svenska kraftnät",
   "as_of": "2026-02",
   "queue_gw": 6.0,
   "dc_gw": 6.0,
   "stage": "requests",
   "queue_what": "New data centre applications in bidding zone SE3 (Stockholm and Gothenburg) since Svenska kraftnät's 2024 analysis",
   "status": "open",
   "status_note": "Svenska kraftnät uses a stepwise connection process and plans a pilot on capacity zones. No national pause. In 2025, over 14 GW left its queue after missing contract deadlines.",
   "facts": [
    "No national data centre total published; SE3 only."
   ],
   "source": "https://www.svk.se/492ade/siteassets/om-oss/organisation/vara-rad/elmarknadsradet/2026/anteckningar-elmarknadsradet-20260204.pdf",
   "source_type": "primary",
   "more": [
    {
     "label": "Svk queue by zone",
     "url": "https://www.svk.se/aktorsportalen/anslut-till-transmissionsnatet/information-om-pagaende-anslutningsarenden/ansok-effekt-per-elomrade/",
     "type": "primary"
    }
   ],
   "checked": "2026-11-20",
   "avg_load_gw": 15.7,
   "chart_gw": 6.0,
   "x_avg_load": 0.4,
   "name": "Sweden"
  },
  {
   "country": "finland",
   "operator": "Fingrid",
   "as_of": "2026-08",
   "queue_gw": 5.0,
   "dc_gw": 5.0,
   "stage": "signed agreements",
   "queue_what": "Planned final capacity of data centre projects with signed connection agreements (developer figures)",
   "status": "reform",
   "status_note": "Fingrid says a signed agreement does not guarantee full build-out; if all were built, Finnish consumption would rise about 40%. Its new grid code for demand above 30 MW (target March 2027) requires flexibility, and requests are processed by project maturity.",
   "facts": [
    "Broader consumption enquiries (all industries) total about 70 GW."
   ],
   "source": "https://www.fingrid.fi/en/news/news/2026/electricity-consumption-is-set-to-increase-sharply--more-balancing-power-will-also-be-needed/",
   "source_type": "primary",
   "more": [
    {
     "label": "Priority rules (Borenius)",
     "url": "https://www.borenius.com/legal-alerts/2026/08/26/government-prepares-new-grid-connection-priority-rules-in-response-to-data-centre-boom/",
     "type": "secondary"
    }
   ],
   "checked": "2026-11-20",
   "avg_load_gw": 10.0,
   "chart_gw": 5.0,
   "x_avg_load": 0.5,
   "name": "Finland"
  },
  {
   "country": "portugal",
   "operator": "REN",
   "as_of": "2026-05",
   "queue_gw": 4.6,
   "dc_gw": null,
   "stage": "expressions of interest",
   "queue_what": "Expressions of interest in the nationwide large-demand zone. Stricter access conditions cut 13 requests worth 46 GW to about 4 GW",
   "status": "auction",
   "status_note": "Since February 2026 all of mainland Portugal is a large-demand zone with higher deposits. REN says about €400m of reinforcement is needed; in October 2026 the government sent the capacity to auction instead of approving REN's dedicated plan.",
   "facts": [],
   "source": "https://eco.sapo.pt/2026/05/29/ren-preve-investimento-de-400-milhoes-para-ligar-novos-consumidores-a-rede/",
   "source_type": "secondary",
   "more": [
    {
     "label": "DGEG large-demand zone",
     "url": "https://www.dgeg.gov.pt/pt/areas-setoriais/energia/energia-eletrica/servicos-e-redes/zona-de-grande-procura-zgp/",
     "type": "primary"
    },
    {
     "label": "Auction decision (ECIJA)",
     "url": "https://www.ecija.com/adcecija/legal-alert-zona-de-grande-procura-governo-recusa-o-plano-de-investimento-especifico-da-ren-e-remete-a-atribuicao-de-capacidade-para-leilao/",
     "type": "secondary"
    }
   ],
   "checked": "2026-11-20",
   "avg_load_gw": 6.9,
   "chart_gw": 4.6,
   "x_avg_load": 0.7,
   "name": "Portugal"
  },
  {
   "country": "germany",
   "operator": "50Hertz, Amprion, TenneT, TransnetBW",
   "as_of": "2025-09",
   "queue_gw": null,
   "dc_gw": null,
   "stage": null,
   "queue_what": "No data centre figure. The four transmission operators held 717 applications worth about 270 GW, of which 211 GW were batteries; the other ~59 GW include data centres and electrolysers",
   "status": "reform",
   "status_note": "Since 1 April 2026 the transmission operators assess large consumers, including data centres, in batches by project maturity instead of first come, first served. Regionally, about 22 GW of data centre enquiries reached Brandenburg since 2022.",
   "facts": [],
   "source": "https://www.transnetbw.de/de/newsroom/pressemitteilungen/uebertragungsnetzbetreiber-fuehren-reifegradverfahren-ein",
   "source_type": "primary",
   "more": [
    {
     "label": "Regional figures (AlgorithmWatch)",
     "url": "https://algorithmwatch.org/en/germany-data-center-boom/",
     "type": "secondary"
    }
   ],
   "checked": "2026-11-20",
   "avg_load_gw": 59.4,
   "chart_gw": null,
   "x_avg_load": null,
   "name": "Germany"
  },
  {
   "country": "ireland",
   "operator": "EirGrid / ESB Networks",
   "as_of": "2026-05",
   "queue_gw": null,
   "dc_gw": null,
   "stage": null,
   "queue_what": "No queue figure published. Data centres used 9.4 TWh in 2025, heading for 31% of national demand by 2034",
   "status": "conditional",
   "status_note": "The de facto Dublin moratorium was replaced by the CRU's connection policy: new data centres must bring matching on-site or local generation or storage, and EirGrid maps constrained areas.",
   "facts": [],
   "source": "https://www.cru.ie/about-us/news/the-cru-publishes-its-decision-on-new-electricity-connection-policy-for-data-centres/",
   "source_type": "primary",
   "more": [],
   "checked": "2026-11-20",
   "avg_load_gw": 4.3,
   "chart_gw": null,
   "x_avg_load": null,
   "name": "Ireland"
  },
  {
   "country": "belgium",
   "operator": "Elia",
   "as_of": "2026-03",
   "queue_gw": null,
   "dc_gw": null,
   "stage": null,
   "queue_what": "No GW figure published. Data centre requests are reported up about nine-fold since 2022",
   "status": "reform",
   "status_note": "The regulator CREG's revised code of conduct allows anti-dormant-capacity clauses in connection contracts, and Elia consulted on them in March 2026. Elia has also floated a separate, capped category for data centres (press, October 2025).",
   "facts": [],
   "source": "https://www.elia.be/en/public-consultation/20260313_public-consultation-on-the-revision-of-the-connection-contract",
   "source_type": "primary",
   "more": [
    {
     "label": "Cap proposal (Brussels Times)",
     "url": "https://www.brusselstimes.com/2322989/belgian-data-centers-drive-energy-demands-to-record-highs",
     "type": "secondary"
    }
   ],
   "checked": "2026-11-20",
   "avg_load_gw": 9.9,
   "chart_gw": null,
   "x_avg_load": null,
   "name": "Belgium"
  }
 ]
}