Eurodatum / Sourcing & corrections
Policy · updated 2026-11-20

How we source and correct.

Every number on Eurodatum can be traced to where it came from. When we get something wrong, we fix it in public and say why.

Where numbers come from

  1. Official first. Grid operators (TSOs and DSOs), regulators, statistics offices and governments: Eurostat, ENTSO-E, Terna, RTE, Statnett and so on. These are labelled Official.
  2. Open datasets second. Curated open data with a licence that allows reuse, such as Ember via Our World in Data, Energy-Charts/SMARD, PeeringDB, OpenStreetMap and the WRI power plant database. Each page names its sources.
  3. Press only when needed. Trade press, law firms or analysts are used only when the operator has not published the latest figure itself. They are labelled Press, and we link the operator's own (older) figure next to them when one exists. Today 11 of 14 grid access rows are official.
  4. No paywalled or restricted data. We do not republish figures from paid reports or from data licensed for private use only.

How we label a figure

  • What it counts. A grid "queue" can mean requests, reservations, signed agreements or granted access. Every tracker row says which, because they differ by a factor of ten or more.
  • When it was true. The month a figure refers to, not the day we found it.
  • Who says so. A direct link to the document, labelled Official or Press.
  • Our own estimates (the AI Power Index, campus power bills, queue compared with average load) are marked as estimates, with the formula on the page.

How we check

  • Automated data (prices, carbon, wholesale markets) refreshes monthly and is checked for gaps and implausible values before it goes live.
  • Hand-curated trackers (grid access, AI campuses) are rechecked against their sources at least every three months, and whenever an operator publishes new figures.
  • Before a figure is used in a press release or report, it is checked against the original document, not a summary of it.

How we correct

  • Anyone can report an error on GitHub. Reports are public, so you can see what was raised and how it was handled.
  • Every change to a published figure goes in the change log below with the date, what changed and why. We do not silently edit numbers.
  • The open dataset on GitHub keeps the full history of every file.

What we cannot promise

No dataset is perfect. Official figures get revised, countries define things differently, and announcements are not commitments. What we promise is that every number is traceable, honestly labelled, checked on a schedule and corrected in the open.

Change log

2026-11-20 · v- · Honest dates and citations on trackers
  • Grid access, AI campus and AI Factories pages now show the date each list was last checked against its sources, not the date the site was rebuilt.
  • The API citation line for the grid access and AI campus trackers wrongly named Our World in Data/Ember and Eurostat as the data source; it now names the actual sources (grid operators, regulators, developers, press; one link per row).
  • Every tracker row now carries a 'checked' date, and the monthly refresh warns when rows are due for the 3-month recheck.
2026-11-20 · v1.1 · Checked every row against official sources
  • Denmark: status changed from 'Paused' to 'Rules tightened'. Energinet's pause ran from early March to 3 June 2026 and was replaced by batch assessment. The data centre figure (14 GW, from press) was removed because Energinet does not publish it; the chart now uses the official all-sector 60 GW, marked *.
  • Finland: 24 GW of requests (press) replaced by Fingrid's own figure, about 5 GW of data centre projects with signed connection agreements (August 2026).
  • Portugal: 41 GW removed; the source we cited did not contain it. Replaced by 4.6 GW of expressions of interest (May 2026), after stricter rules cut 46 GW of requests to about 4 GW.
  • Sweden: 6.7 GW (press) replaced by Svenska kraftnät's figure of about 6 GW of new data centre applications in SE3 (February 2026).
  • Belgium: status changed from 'Cap proposed' to 'Rules tightened'. The data centre cap was only reported in the press; the official measure is a crackdown on unused reserved capacity.
  • Norway, France, Spain, Netherlands, Germany: same figures, now linked to the grid operator's or regulator's own publication.
  • Italy and Poland: figures unchanged and still press-sourced, now labelled as such, with Terna's own older figure linked for Italy.
  • Headline reworded from 'GW of data centre requests' to 'GW of data centres asking for, or holding, a grid connection', because some figures are reservations or signed agreements.
2026-11-20 · v1.0 · Grid access tracker launched
  • 14 countries, figures mostly from trade press and law firms citing grid operators.